You don't have javascript enabled. Good luck with that.
Pencarian
Penertiban Bukit Duri Dijadwalkan Selesai Hari Ini

Bukit Duri Building Control Completed Today

The building control along Ciliwung Riverbank, Bukit Duri Urban Village, Tebet, South Jakarta is targeted to complete today. It is because Ciliwung river normalization can not be postponed.

The controlling must complete today

“The controlling must complete today,” said Tri Kurniadi, South Jakarta Mayor, Wednesday (9/28).

He added that buildings remain left at RW 10 are buildings with certificate by 11 units.

No Compensation for Bukit Duri Citizens

“The rests buildings are demolished fully. If they are able to lease house here, they should be able to pay flat unit lease too,” he added.

Meanwhile, City Police Chief, Mochamad Iriawan, admitted the demolition process run smoothly.

“The controlling run smoothly. It is hoped will bring goodness for Jakarta citizens too,” he stated.

Based on the data, 66 buildings are demolished today. Those are five at RW 10, 14 at RW 11, 33 at RW 12, and 14 buildings at RW 12 but outside the map.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5426 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4583 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1777 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye997 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye956 personAldi Geri Lumban Tobing